An owner's representative managing a property from a distance usually has the same three questions every week. What got done? What is still waiting? And what did that invoice pay for? When the answers live in texts, emails, proposal PDFs and a stack of invoices, each one takes a phone call, and the thread between them gets lost.
A facilities activity tracker puts the three answers on one page. Proportional FM built one for a representative of an out-of-state ownership group running a two-building office property in Dallas-Fort Worth, during a stretch of heavy mechanical repair. This article describes how it is structured and the rules that made it worth trusting. The full tracker is linked below.
Two ways into the same record
The tracker opens two ways. Work by building answers the first two questions: for each building, what is completed and what is still needed, with dates, locations and the facts of each job. Invoices answers the third: each invoice, the lines it covered, and a link from every line to the work behind it.
Each building section also carries its equipment: the rooftop and mechanical units, their manufacturers, and when each was inspected or serviced. Where the building automation system shows how the space is being served, the floor plans are there too. In the tracker linked below, those are the fan-powered box views for each floor, with the zone temperatures at the moment they were captured.
The rules that keep it trustworthy
A tracker is only useful if the reader can rely on it without checking it. These rules held it to that standard:
Separate the buildings
Every item belongs to exactly one building. Shared work is marked as shared, so nobody has to guess which building a line refers to.
Two statuses only
Completed or needed. Extra states like "discovered" or "in review" read as progress without being progress.
Invoiced is not completed
Work at proposal stage shows the proposal, not an invoice. A paid invoice never stands in for confirmation that the work is done.
Facts, not recommendations
The tracker records what was found and what was done. Recommendations belong in proposals, where they carry scope and approval.
Every line goes both ways
Each invoice line links to the work it paid for, and each finished job links back to its invoice. Shared invoices are tagged Partial or Combined.
The statement stays the record
The tracker explains the invoices. The account statement remains the authoritative record of balances.
What it is not
A tracker is not a scheduled report. It changes when the work does: a new proposal, a finished repair, a new invoice. It is not a condition assessment either. A Facility Condition Assessment documents the whole building; the tracker follows the work that comes out of it. And it is not a statement of account.
When a property needs one
Most single-site owners do not. A short email after each visit covers them. A tracker earns its place when the owner is not local, when there is more than one building, or when enough work is moving at once that the approved-versus-done thread gets lost. In those cases it replaces a weekly round of status calls with a page anyone on the ownership side can open.